| Bilge Pump Installation |


| Before the pump can be installed, the location of the forward bulkhead must be determined. A cardboard template was fit to the interior of the kayak. The template was used to trace the pattern of the bulkhead onto 1/4" plywood. A stationary belt sander fine tuned the fit. After shaping, the bulkhead was covered with 6oz. fiberglass cloth. |
| The bulkhead was temporarily wedged in place with the pump mounted so that I could test the placement of the pump. Satisfied with the placement, I marked the location of the discharge hole. |


| Pump mounted. |
| I was happy to see that the discharge pipe aligned with the hole. A black plastic lawn irrigation fitting was epoxied into the hole and trimmed to the curvature of the kayak. |